Time in garage: 3 hours
Last week I refocused on my critical path and decided I wanted to get the engine and transmission installed on the chassis to free up room in my garage. First order of business was removing the oil pan again and installing the new oil pump cartridge. After removing the oil pump I realized the pick up screen was broken at the oil inlet point. Checking the Moss catalogue I noticed a new screen was around $38...figuring I could save $38 I pulled the pan off my spare engine to check out the screen ...it was flawed in the same way. A quick e-mail to my supplier indicated the need to solder the screen. My rational self questions the need to fix the problem based on the fact the solder job would need to be correctly or there could be problems with contamination of the oil supply by loose solder...also it would probably be difficult to get the existing screen clean enough to solder properly....given both engines have the same problem and I am putting on an external oil filter conversion kit onto the engine which may filter the oil better than the stock system I may skip the step...more research is required....
It looks like the transmission input seal will need to be replaced....some oil leaked out when I had the transmission sitting on the bell housing when I was cleaning it...probably an indication the seal has dried up in storage...
I have to pick up some new bolts,nuts and lock washers for the new engine mounts...also new washers for the oil pan...oil pan bolts need to go into the Eastwood tumbler for renewing.
I spent about 30 minutes cleaning up the gasket mounting flange and the outside of the oil pan in prep for paint...
Lots of lugging around of engine blocks and some oil spillage to take care of.
A productive time...
Saturday, December 1, 2012
Wednesday, November 28, 2012
Transmission Clean Up
Time in Garage: 90 mins
I completed my garage clean up and patially cleared off my work bench. Next I focused on removing 53 years worth of grime and dirt from the transmission case. I had previously attempted to powerwashed the assembly but a lot of what is remaining is really baked on and the process was largely ineffective... Last night I used a drill and wheel attachment (not a wire wheel) to tackle the really tough spots. My small scrapper also came in handy... Today I am going to pick up some brake cleaner...it is supposed to work really well for these type of clean ups..
My supplier has located a fender bead kit in his inventory that he has offered to me...not sure of the price yet but it might be worthwhile to look at...
Tuesday, November 27, 2012
Shocks and Part Sort
Time in garage: 3 hours
Yesterday I fired up the garage heater and spent about 3 hours working out in the garage.
I am in the midst of a sorting and tidying of the space which started last week. Slow going as I sort through the misc stuff that has piled up on the bench and floor from my end of the gardening season work/fence painting/gate fixing activities earlier in the fall...
I have 3 Rubbermaid tubs full of parts that I sorted through and organized into 2 plastic containers, one for engine and the other for the chassis. All related parts are now together and ready to reinstall. I also put together another container of "spare" parts plus sorted a number of fasteners into a compartmentized box so I have easy assess to nuts. bolts and washers...it felt good to be handling the parts and doing some pre-work on the project...
During the sort I determined ( I have been sitting on the fence about doing this for a while) to replace the aftermarket shocks that I spent a couple of hours refurbishing last spring...I figure for $28 and change each it is not worth trying to make the other ones fit (I tried a couple of times last winter) when I can have an OEM style new shock that should just bolt in...I placed the order with my supplier and enquired about the floor to chassis mounting strips that I will need to remount the body....
For the last couple of weeks I have been daydreaming (a fair amount) about getting back to the project, also doing project planning while walking my dog Lily, which is a good sign I am finally getting back into the right headspace to continue the project.....
Yesterday I fired up the garage heater and spent about 3 hours working out in the garage.
I am in the midst of a sorting and tidying of the space which started last week. Slow going as I sort through the misc stuff that has piled up on the bench and floor from my end of the gardening season work/fence painting/gate fixing activities earlier in the fall...
I have 3 Rubbermaid tubs full of parts that I sorted through and organized into 2 plastic containers, one for engine and the other for the chassis. All related parts are now together and ready to reinstall. I also put together another container of "spare" parts plus sorted a number of fasteners into a compartmentized box so I have easy assess to nuts. bolts and washers...it felt good to be handling the parts and doing some pre-work on the project...
During the sort I determined ( I have been sitting on the fence about doing this for a while) to replace the aftermarket shocks that I spent a couple of hours refurbishing last spring...I figure for $28 and change each it is not worth trying to make the other ones fit (I tried a couple of times last winter) when I can have an OEM style new shock that should just bolt in...I placed the order with my supplier and enquired about the floor to chassis mounting strips that I will need to remount the body....
For the last couple of weeks I have been daydreaming (a fair amount) about getting back to the project, also doing project planning while walking my dog Lily, which is a good sign I am finally getting back into the right headspace to continue the project.....
Tuesday, October 23, 2012
Schedule Review and Priorities
Time spent in garage: 2 hours
Tasks: tool clean up/moved parts from carboard box to plastic tote. Put away tool boxes and sorted through some items on my workbench...I didn't get everything done I set out to do but at least I went out to the garage for a while...
I reviewed the schedule I created in late 2011...fortunately there were some items knocked off the list which was encouraging but at the same time "reality" set in around the number of tasks I didn't tackle and how far off schedule I really am. I reformatted some items on an existing page and looked at per task time estimate and made some adjustments. I have about 80 hours of identified work to complete to get to the point of installing the body on the chassis...I revisited what I thought the must do task are-the highest priorities and set out plans to get the work done...painting the underside of the body and engine bay are number 1...which will mean protecting the chassis from overspray and making sure all the body work on the underside of the body and fender wells is completed prior to the paint going on....I figure I have about 10 hours of prep work to complete before I paint and that I need to get going on this aspect asap before the weather really caves in...
Sunday, October 21, 2012
Garage Stereo System Installed
I spent about an hour last Monday sorting through old stereo equipment, looking for a tuner,amplifier and speaker combo that would work for the garage...after some testing I found what I needed and moved the equipment out into the garage and set it up....sounds great...much richer sound than the old boom box ....another enhancement to the man cave...
I pulled a couple of rims from my storage shed...I have one more rim that needs powder coating to replace the non-original wheel that is current installed on the chassis...
Other than these two activities-no further action on the Triumph in the last week-other than numerous
I pulled a couple of rims from my storage shed...I have one more rim that needs powder coating to replace the non-original wheel that is current installed on the chassis...
Other than these two activities-no further action on the Triumph in the last week-other than numerous
Sunday, October 14, 2012
Musings
On Saturday I moved the chassis back into the garage...I was concerned about exposure to the elements by leaving it in the driveway...time spent: 45 minutes ( I had to remove the rear wheels again to move the chassis under the body stand...)..time well spent...
I am presently in the midst of another major project-decluttering our basement which is detracting from me getting back to the Triumph assembly. The job has a big scope as there are many tasks to complete...my wife and I are on a 31 day timeline (we are making good progress-now on day 7) to remove all unwanted and unused stuff and free up space to maximize her art studio efficiency...a much needed enhancement and a very logical priority....
I hope to sneak out to the garage for an hour or two today and do some sorting of parts and clean up of the space...I also plan to move a better stereo out there (the components are presently stored in my basement) as the existing unit is cumbersome to use and doesn't have very good sound...
I continue to ponder the whole "project management" aspect of rebuilding old cars. Making the work a priority and knocking off tasks to get me closer to completion...As I have discussed earlier I can see why so many project cars get abandened...reality sets in with respect to skills, money, scope and most importantly time...I don't want my project to become a statistic in the abandoned project car world...
While in the garage yesterday I realized "once again" my tools are in a state of disaray which is a distraction to me....I need to focus on this aspect today...
I am presently in the midst of another major project-decluttering our basement which is detracting from me getting back to the Triumph assembly. The job has a big scope as there are many tasks to complete...my wife and I are on a 31 day timeline (we are making good progress-now on day 7) to remove all unwanted and unused stuff and free up space to maximize her art studio efficiency...a much needed enhancement and a very logical priority....
I hope to sneak out to the garage for an hour or two today and do some sorting of parts and clean up of the space...I also plan to move a better stereo out there (the components are presently stored in my basement) as the existing unit is cumbersome to use and doesn't have very good sound...
I continue to ponder the whole "project management" aspect of rebuilding old cars. Making the work a priority and knocking off tasks to get me closer to completion...As I have discussed earlier I can see why so many project cars get abandened...reality sets in with respect to skills, money, scope and most importantly time...I don't want my project to become a statistic in the abandoned project car world...
While in the garage yesterday I realized "once again" my tools are in a state of disaray which is a distraction to me....I need to focus on this aspect today...
Friday, October 12, 2012
Trial Fit -Rack and Pinion
It looks like I am going to have to modify the mounting arrangement for the Moss Rack and Pinion conversion after all...frame is straight and to spec and the steering knuckle assembly still does not clear the frame appropriately...I will send an e-mail to my supplier and give them an update....
I did mock up a 'fix" that should be structurally sound and not take too much time to execute...I plan to take pictures and document the process...
Time spend: 30 mins