The garage has "once again" become very cluttered with tools and piles of scrap sheet metal pieces everywhere so the first order of business will be to clean up and create some order...It is -37 degrees C. this morning so I will probably wait until later in the day to venture out to the garage and to fire up the heater....
Monday, January 31, 2011
Triumph TR3-Rear Valance Work-Part 8
A few days ago I tackled more final patch piece fitting plus removing the rear bumper bolt that had been ground off to remove the rear bumper. (done a few years ago). I needed to do this prior to attaching the replacement patch panel on the right hand side. Of course everything was well rusted and after a fair amount of effort movement was experienced. Unfortunately the bolt nut (under the frame) was too rusted for total removal so I applied liberal amounts of WD-40 and hopefully today I will be able to remove the bolt completely and put new ones on the purchase list...another step towards completing the rear valance.
Thursday, January 27, 2011
Triumph TR3-Rear Valance Work-Part 7
A stellar evening in the garage (the classical music that played in the background added an interesting dimension). It was one of those work sessions where everything went well with very little rework. I spent about 3 hours riveting and bonding the rear valance brackets and repair patches for the right rear fender area. Earlier in the day I fabricated a bracket with a "captured" nut ( I spent about an hour on the task) where the right hand fender attaches at the back. The original area was completely rusted out so the attachment point needed to be reestablished. I am very pleased with the overall results and look forward to more productive work today. My plan is to finish off attaching the panels on the left hand side and getting the fabricated pan (that fits under the spare tire cover) installed...
Wednesday, January 26, 2011
Triumph TR3-Rear Valance Work-Part 6
Success yesterday....the right hand side patch panel is now fabricated and trial fitted. Looks good. There is a small amount of trimming to undertake and reconstruction of the flange piece that holds on the rear fender (the lower portion is rusted)....I estimate another hour or two to wrap things up on the right side.
I took a long straight edge and made sure the right hand panel lined up to the center piece ( I have clamped everything together with vise grips and screws). Today I will trial fit the left hand patch panel again then open up the garage door and step back ten feet or so and make sure everything looks good from a distance then final assembly with panel adhesive (and sealer), a skim coat of filler where needed and a primer coat then I can move on to finishing off the small patch panels by the rear of the doors on both sides. Then my attention moves to the mechanical work....
Note: in a well funded full restoration the complete back valance would be replaced. I priced out the panel last year and if I recall I found one for $800. Far outside the "reconstruction" budget. Yesterday I estimated I have about 20 hours in the reconstruction of the panels. It would not have been worth paying someone to do the work-buying the panel would have been the appropriate path forward vrs paying a third party to fabricate.
Tuesday, January 25, 2011
Triumph TR3-Rear Valance Work-Part 5
Back into the garage yesterday after being "out of town" for nearly a week. I am now a couple of weeks behind where I wanted to be at the beginning of January but that is "OK" as family comes first and some unexpected "events" occurred that took me away from the garage.
I fabricated a successful patch piece for the left hand rear valance (utilizing some of the components of the original fabricated piece-which was satisfying) and trial fitted it and it worked well. I embarked on a similar modification to the right hand side panels which I am not as happy with. I ran out of energy and enthusiasm late in the afternoon and decided it was better to leave the task and take a break than try and "force" myself to work on something that was not coming together in a way I had envisioned. Working on the Triumph is supposed to be an enjoyable pass time- not an ordeal so I walked away.
While I was out in the garage I started to contemplate the rear valance panel attachment process and what the critical path will be. I think I have that worked out now and today I will start prepping the panels for panel adhesive and attachment. It will be great to see all the panels fabricated and attached to the car so I can add the final skim coat of filler and get the areas primed.
Monday, January 17, 2011
triumph TR3-Rear Valance Work-Part 4
Yesterday I did another trial fit of the fabricated lower piece of the valance (and attached it temporarily to the car) and it fits well and looks good. Unfortunately the match up to the other patch panel (left hand side)was not as clean as I would like (to be expected as I fabricated the pieces separately and hadn't done a trial fit of the two pieces before) so I decided to remove it and do some minor trimming to see if I could get a better fit. Unfortunately it doesn't meet my standard for appearance (structurally it is sound) so through the process I decided I will probably reject the flange component (3rd time) I fabricated a few days ago and start again with a bit different approach. Rework.
Sunday, January 16, 2011
Triumph TR3-Rear Valance Work-Part 3
Yesterday I started assembling the rear valance component that I fabricated out of a discarded fender, trial fitting and attaching my fabricated flanges for attaching to the body. The day was productive and enjoyable. I worked for about 2-1/2 hours or so all together. I determined to fasten the flanges with rivets and the high strength epoxy panel adhesive that I purchased for this type of work. The adhesive gives all the advantages of welding by providing a very strong bond.
I spent some time in the evening going over the Ron Francis wiring catalog looking at the different after market wiring harnesses and accessories like ignition and dimmer switches etc. I also contemplated moving over to "bright" LED tail and turn indicator lights to further enhance the safety of the car. I also determined to hold off on purchase of the parts until I get the frame reconstructed. Pricing seems pretty consistent.(no sales being offered etc) so no down side to waiting that I can see.
I think I am going to have to get myself a better air compressor to run my bead blaster cabinet and some of the air tools that require more capacity than I current have. I did some checking around on Kijjiji, Sears, Canadian Tire etc etc and found a 33 gal unit on sale for 399.00. A bit cost prohibitive so I may rent instead?
I also pulled out my TR3 reference book and looked at the great cars illustrated. It is good to dream of the finished state from time to time...
Thursday, January 13, 2011
Triumph TR3-Rear Valance Work-Continued
Back into the garage yesterday for about 3 hours. Still wrestling with making and fitting the attachment flanges for the replacement "patch" panels on the rear valance. Some rework was required including the necessity to temporarily attach the panels (left hand side) to the car to revisit fit generally. I am happy with the progress but it as nearly every other activity undertaken on the car, taking much longer than I anticipated.
Subscribe to:
Posts (Atom)