Friday, December 28, 2012

2012 Project Review

Year End Review

Hmmm...I made progress in 2012 which is a good thing!!!!!

Has my project been well managed in 2012?  No!!!!!

If this was a performance evaluation of me as a project manager I would probably be fired!!!

But I don't really want to dwell on my short comings...my earlier blogs reflect the challenges and my observations...nothing to be gained by going back over it all again....

So what is needed "right now" to get the project back on track?

1. Setting garage time as a priority in 2013
2. Celebrating the successes and building on them to move the project forward
3. Continue to search out inspiration from what ever sources are available
4. Stay positive-do not dwell on the obstacles...
5. Stay energized---

I have the skill sets and the resources...I really need to focus.....




The biggest challenge is setting garage time as a priority...



Saturday, December 22, 2012

Oil Filter Head Clean Up

Time in Garage 1.5 hours

Cleaned up my recovered Oil |Filter Head...looks good!!!!!
Spent some time straightening out my work area...

Saturday, December 15, 2012

Out into the Shed

Time in the great outdoors: 1 hour

There was a break in our winter weather yesterday (higher temperature) that allowed me to venture outside and sift through my shed for the oil filter head that I had mistakenly thought I didn't need when I bought my spin on filter adapter from Moss Motors. (I didn't read the instructions first-left them in the box until very recently)...I figured the part was in one of the Rubbermaid tubs I have stored. Unfortunately the extraction required the moving of a number of items including my table saw which is heavy and cumbersome....about 45 minutes later I came to the realization the part was not where I anticipated it was!....next step was to move over to my other shed-which is much more accessible but still required the moving off my lawn mower and assorted "stuff" to extract a box of spare parts I had put aside for later sale...the head was there....it is now in my garage awaiting clean up and reinstallation.

I delivered one of my "straightened" spare wheels down to the powder coater for refinishing. I need to change over one of the wheels on the chassis which is not an OEM issue which has slots verses the round holes of the original wheels. The tire will need to be moved over. One of the things on my list of tasks...

My parts are in...with the exception of the shock absorber mounting rubbers which are on back order....

Some activity this week but no "wrench turning" as such...

Saturday, December 8, 2012

Water Pump and Head Manifold Port Clean Up

Time in Garage: 2 hours

Removed water pumps from both engines. Not sure of condition of seal on the '59 engine so I intend to utilize the '57 water pump in the reassembly. Cleaned up the head manifold port area-removed the old gasket...spent some additional time cleaning up the block. Put the manifold hold down clamps and studs and bolts into the Eastwood Tumbler...they came out "looking good"....

Friday, December 7, 2012

More Block and Trans Cleaning

Time in garage: 90 minutes

Temporarily installed oil pan and brought the engine upright again. Cleaned the manifold side of the block and the remaining sections of the timing cover and engine mount that I couldn't get at when the engine was on it's side...then back to the transmission for more clean up...I am about 80% finished now...

Tuesday, December 4, 2012

More Parts Cleaning


Time in Garage: 2 hours

Sprayed brake cleaner on the block areas that I have been working on...the block cleaned up well...sanded the distributor side in prep for painting....went back to the transmission for additional cleaning...There is some kind of black material on the casing...perhaps some type of undercoating or road tar...takes a while to clean off for sure...

Put the oil pan bolts and washers in the Eastwood tumbler and cleaned them up..

I decided to purchase a new oil pump pick up screen-ordered yesterday and added to the existing order..

My wife asked me last night how I was doing out n the garage and was I making progress...I said "well" and I was making progress..I explained briefly what I was doing and that I hoped to have the drive train reinstalled and the chassis ready by the end of February..I figured this would give me the 60 hours I have estimated for the job taking into account Christmas and my winter vacation and the kitchen reno I am assisting my daughter with at the end of January..she looked somewhat skeptical...I am not surprised...

Sunday, December 2, 2012

Oil Pan and Engine Clean Up


Time in Garage: 2 1/2 hours

I finished cleaning up the oil pan including a primary sanding of the finish for final painting. Next I turned my attention to the engine block cleaning the distributor side of the block along with the timing cover area. I have decided to remove the water pump for painting and replacement of the gaskets which I ordered yesterday.

I also inspected the fender beads (on Friday) and determined they are pretty ratty for reinstallation so I decided I would take the new ones offered me at a 30% discount from my supplier.

I am still researching the need to solder the oil inlet screen...