Friday, May 20, 2011

Triumph TR3 -Wheels and a New Power Tool


It is gardening season and for the last week or so I have been focused on building raised beds and cold frames and not much TR3 work has gone on. However yesterday I ventured out onto the driveway and checked out the "quality" of my wheels. I determined the trueness by mounting them on the rear axle and rotating them. I have 9 wheels in total-2 are junk-bent with the bead messed up, 2 are in good shape and 1 is good cosmetically fine but requires straightening, 3 are slotted wheels which are non-standard that I am following up on to see if they are after market or what? Leaving 1 wheel of questionable status. Rather than dish out money for rim straightening I have decided to order 2 used wheels from my supplier @ $35 each which should give me 5 good wheels total.

I purchased a 12vmax Li-ion Makita Cordless Driver Drill which I have had under consideration for a year or so. A friend has a similar model that he uses quite extensively for his home renovation projects. I watched a car restoration video where the mechanic used one of these small drivers and it seems to be useful in that context. I purchased some 1/4 drive nut drivers and socket adapters so I am ready to go. I am a big Makita fan as I like their designs and quality. I have 6280D drill which I have used extensively over the last five years or so and only recently have both batteries died. I am currently searching out replacements as I think the drill still has lots of life left in it!!

Today I plan to get back into the garage and do some more parts clean up painting.

Monday, May 16, 2011

triumph TR3 -De-greasing/De-rusting

I spent a couple of hours on Saturday further cleaning the front end components.

I purchased a liquid that destroys rust and incorporated it in my clean up. I filled up a container and immersed the parts for up to 5 hours. The process worked pretty well.

I still have the coil springs to tackle and a few other parts that I may take to my local sandblaster to get the rust off...

Thursday, May 12, 2011

Triumph TR3 -More Front Suspension Attention

A great evening in the garage. Soul soothing music on the I-Pod and some excellent "in the zone" time at the work bench further dismantling suspension components for final clean up and painting... 2-1/2 hours overall. The discard box continues to grow as I sort out the best components. So far so good. More parts cleaning planned for today.



Sunday, May 8, 2011

triumph TR3 -52 Years of Grime

Last evening I ventured out into the garage and started cleaning up suspension parts. Lots of grease, grime and caked on dirt challenged me on the "clean up" of most of the components. The task was fairly routine and in a strange way meditative as I made my through the layers of crud to get me to a point where I can actually see most of the surface in order to prep for a new coat of Chassis Black paint. I pulled apart the upper wishbones-doing so I made an interesting discovery that the wishbones are "boxed" in on the underside vrs being open (on the '59). The '57 had an ice racing history so I can assume somewhere along the road a determination was made to reinforce the wishbones. I also noticed the springs off the '57 are about 1/2 inch shorter in height and appear to be more heavy duty than the '59. I am following up with Drake Motors to try and determine which springs I should be using? The '57 springs would lower the car 1/2". They are also in better shape (far less rust) so I am leaning towards utilizing them.

I am still sorting out my parts order for the front end components I need to bolt the front suspension back together. Hopefully all of this will be finalized by tomorrow...

Saturday, May 7, 2011

Triumph TR3 -Front End Assessment

Yesterday I focused on further disassembly of the subcomponents of the front suspension supplemented with a visual inspection of the components. I have decided to replace the ball joints since I have everything disassembled. It is not worth reinstalling questionable components based on the reasonable cost of new. I also started to sort through 2 suspensions worth of components to pick out the best pieces to refurbish. Today I plan to finish that task and start on the clean up and painting. Lots of work to do before reassembly can begin. I am very eager to layout the powder coated chassis and start installing new parts..

Thursday, May 5, 2011

Triumph TR3 - Dismantle of Front End Complete!!!

Last night I finished off the dismantling of the front end-all the components are now removed and the front of the chassis is bare. A major milestone reached. Upon reflection I figure I am about 3 weeks behind schedule based on my July 31st reassembly date. Hopefully I am going to catch up soon...

I now have a couple of boxes of parts to sort through in order to choose the best components and then I need to spend some time cleaning them up- followed by a new coat of Eastwood Chassis Black. I made a small bench by putting a piece of particle board on my table saw stand that I am going to use to work on the parts. It is sitting on the back patio out in the sun which will be a nice change to working indoors or on my shaded driveway.

I need to keep my head down and focused on the chassis reconstruction and try to make up some time in the next few weeks. It is going to be a great feeling to start incorporating some of the new parts into the rebuild..


Sunday, May 1, 2011

Triumph TR3 - Back to the Front Suspension

My shade tree mechanical quest/adventure returned to the driveway yesterday. I have almost finished the front suspension disassembly (just the lower wishbones remain) having spent about 3 hours working on the task. It went a lot smoother and faster than the day before thanks to my neighbor's spring compressor and my improved knowledge of how the components are configured. Interestingly upon disassembly the '59 front suspension components turned out to be much more "worn" generally than I had anticipated particularly the trunnions. It looks like more $$$ need to be spent.

My son came along at absolutely the best moment to help me tilt the frame and rest it on the table saw stand like I did the day before . I tried to do it a couple of times myself and just couldn't seem to muster the strength and coordination to get the job done. There certainly was a degree of physicality required to move the frame around and disassemble the components-a pretty good workout all round . I will say it was great to have a hot tub to soak in afterwards-I really needed to relax my weary muscles...

I have decided to leave the rear end alone for the time being and start cleaning up and painting the front end components. This will be my main focus for the balance of the week.