Time in Garage: 2-1/2 hours over 2 days
$$ spent: $40
Did some more parts cleaning and finish sanding. Took my down pipe to a local muffler shop to get a transition piece welded on and a perforation fixed. All the rust has been removed and the down pipe and exhaust system is ready for final paint. I also cleaned up the driveshaft and sanded down the finish for repaint. The u-joints look good.
I made an enquiry about getting the rear axle seals replaced. Not sure if I need to do this or not but estimated cost is between $250 to $400 to get the work done.
I also moved the engine and transmission to the back of my garage near the garage door to get it out of the way so I can remove the rear axles to reposition the backing plates so the parking brake and brake lines line up properly.
I purchased grey hi temperature paint, a new 3M buffing wheel and a package of dust masks. Plus a magazine called "Overkill" published by Hot Rod Magazine. An impulse purchase off the magazine rack near the checkout counter. When I got home I opened up the magazine and what I saw within rocked my perceptions of what can be created automotive art wise. Wow...incredible machines show casing creative pursuits and a level of craftsmanship that I admire on many levels. The magazine really got my blood pumping for some reason? Particularly around a Mazda RX7 rotary powered hot rod....I started to day dream about the '57 and how cool it would be to create a Mazda powered TR3 Rat Rod incorporating some of the ideas I saw in the magazine....my mind raced with the possibilities...
But first things first!! Back to the '59
Showing posts with label overkill magazine. Show all posts
Showing posts with label overkill magazine. Show all posts
Thursday, February 13, 2014
Subscribe to:
Posts (Atom)